Inspection IDReason for InspectionInspection DateInspection Status 
SIN-00213388 Renewal 10/18/2022 Compliant - Finalized
RegulationLIS Non-Compliance AreaCorrection RequiredPlans of CorrectionCorrection DatePOC Status
6400.141(c)(6)Individual #1, date of admission 1-13-22, and had a Chest X-Ray performed on 1-14-22.The physical examination shall include: Tuberculin skin testing by Mantoux method with negative results every 2 years for individuals 1 year of age or older; or, if tuberculin skin test is positive, an initial chest x-ray with results noted. LPN has been retrained on the importance of having TB tests completed every 2 years. LPN has systems in place to track the due dates of such. New procedure established - if physician indicates they do not have an available appointment prior to the due date, individual will be taken to a walk-in facility to have TB test completed. 10/20/2022 Implemented
SIN-00232907 Renewal 10/11/2023 Compliant - Finalized
SIN-00196542 Renewal 11/23/2021 Compliant - Finalized