Inspection IDReason for InspectionInspection DateInspection Status 
SIN-00210786 Renewal 08/30/2022 Compliant - Finalized
RegulationLIS Non-Compliance AreaCorrection RequiredPlans of CorrectionCorrection DatePOC Status
6400.67(b)On 8/31/22 at 12:40PM, there was standing water present on areas of the floor near the furnace in the basement that appeared to be coming from an improperly draining dehumidifier. Floors, walls, ceilings and other surfaces shall be free of hazards.The humidifier was moved to drain. This will allow the water to go directly into the drain. 09/01/2022 Implemented
6400.101On 8/31/22 at 12:51 PM, there was a padlock latch on a door of the stairwell leading from the first floor to the second floor of the home causing an obstruced egress from the second floor to the first floor when engaged.Stairways, halls, doorways, passageways and exits from rooms and from the building shall be unobstructed. The lock and latch was removed. 08/31/2022 Implemented
6400.214(b)On 8/31/21 at 1:00PM, the most current copies of Individual #1's physical examination, dental examination, and psychiatric medication review were not present in the home. The most current copies of record information required in § 6400.213(2)¿(14) shall be kept at the residential home. The documents were copied and placed in the home on 9/2/22. 09/06/2022 Implemented
6400.32(r)On 8/31/22, Individual #1 did not have a lock on Indvidiaul #1's bedroom door. Individual #1's record contained a lock consent form, dated 1/1/22 indicating that Individual #1 wanted a lock on their bedroom door.An individual has the right to lock the individual's bedroom door.The door knob was replaced on door. 09/15/2022 Implemented
SIN-00179081 Renewal 10/20/2020 Compliant - Finalized
RegulationLIS Non-Compliance AreaCorrection RequiredPlans of CorrectionCorrection DatePOC Status
6400.68(b)On 10/21/20 at 11:42 AM, the hot water temperature measured 127.0 degrees Fahrenheit at the bathtub in the bathroom by the bedrooms in the home. Hot water temperatures in bathtubs and showers may not exceed 120°F. On October 24, 2020 On-Site Companionship Services discontinued the use of digital thermometers and began using manual thermometers. The manual thermometers are placed on the faucet in the kitchen and the bathtub faucets where the clients use. On the 1st of every month the CEO or designee shall audit the self-assessment documents used to measure the water temperature in the bathtubs and showers to ensure that the temperature does not exceed 120 F. [The hot water temperature documentation from 11/23/20-11/2/20 has the temperature measuring at 118 degrees Fahrenheit each day. Copy submitted to the Department on 12/7/20. On 11/20/20, 14 staff persons were trained on the regulations regarding hot water temperatures and the agencies procedures for measuring and reporting hot water temperatures exceeding 120 degrees Fahrenheit. Training documentation submitted to the Department on 12/7/20 (AES,HSLS on 12/9/20)] 10/24/2020 Implemented
6400.73(a)On 10/21/20, at approximately 11:45AM, when the handrail was used to ascend the stairs between the basement and kitchen, the handrail detached completely from the wall. Each ramp, and interior stairway and outside steps exceeding two steps shall have a well-secured handrail. On October 26, 2020 the handrail used to ascend the stairs between the basement and the kitchen was repaired. Proof of the repair will be uploaded here or mailed in to the address that has been provided. The CEO of designee shall audit the self-assessment document PRIOR to On-Site signing any leases and communicate with the management company regarding any repairs that will be needed. The CEO or designee will also audit the self-assessment documentation on the 1st of every month to ensure that all of the rails are secure. [Immediately, the CEO or designee shall develop and implement a policies and procedures for staff to follow when a repair is needed at the homes. Immediately and upon hire, the CEO or designee shall educate the staff persons in the policies and procedures to ensure homes are in good repair including hand rails. (DPOC by AES,HSLS on 12/9/2020)] 10/26/2020 Implemented
SIN-00194376 Renewal 09/28/2021 Compliant - Finalized