Inspection IDReason for InspectionInspection DateInspection Status 
SIN-00212250 Renewal 09/22/2022 Compliant - Finalized
RegulationLIS Non-Compliance AreaCorrection RequiredPlans of CorrectionCorrection DatePOC Status
2390.72(a)The passageway/work aisle was obstructed with a large pallet causing a barrier.Passageways and work aisles shall be unobstructed at all times.Large pallet was immediately moved by Production Leader when this was witnessed on the work floor. 10/06/2022 Implemented
2390.151(f)Documentation was not received that the assessment 9/27/2021 was sent 30 days prior to the ISP team meeting on 3/20/22 for individual #1The program specialist shall provide the assessment to the individual plan team members at least 30 calendar days prior to the individual meeting.Documentation was immediately uploaded into shared folder for licensing documents when it was brought to Program Specialist's attention that it was not included in original uploaded documents. 09/29/2022 Implemented