Inspection IDReason for InspectionInspection DateInspection Status 
SIN-00214770 Renewal 11/14/2022 Compliant - Finalized
RegulationLIS Non-Compliance AreaCorrection RequiredPlans of CorrectionCorrection DatePOC Status
6400.80(b)There were leaves caught in the gutters, enough to be visible from the walkway, and likely to block rainwater effectively draining away from the home The outside of the building and the yard or grounds shall be well maintained, in good repair and free from unsafe conditions.What was done immediately to correct the specific issue cited? A maintenance request work order was submitted for the leaves around the gutter and driveway to be removed. On 11/16/22 this was resolved. What specific change will be made? All staff and management are required to attend Quarterly Regulatory Workshops facilitated by the Quality Improvement Department. A variety of topics are discussed each quarter, all specific to the regulations followed. Household common areas and spaces specific to the individual(s) are expected to meet the regulatory and agency standards. The Site Supervisor is responsible for conducting a weekly site inspection and completing the Weekly Residential Site Checklist. All staff are responsible for recognizing violations, areas in need of improvement, and following the reporting process. The checklist captures all regulatory and agency expectations. All discovered areas of concern or violation initiate follow-up by the Site Supervisor, or designee, which includes the purchasing and installation of items and/or submission of a maintenance request. If the matter requires maintenance, the Real Estate Department (RED) is responsible for providing updates and follow through. If the matter can be resolved by the Program, the Site Supervisor is responsible for the resolution. If unresolved within one (1) week from the date of discovery, the Program Director is responsible to address the Site Supervisor regarding the status, delay in resolution, and plan of action. If unresolved within two (2) weeks from the date of discovery, the Regional Director is contacted to either: escalate the matter to RED or escalate the matter to the Program Director to address and resolve immediately. Program Director and Site Supervisor will ensure that any unresolved area(s) of concern, do not pose a health and/or safety risk to the Participants or staff. Who (by title) will make the change? Program Director and Site Supervisor will be responsible for making the change. When will the change be made? Gutters and driveway were cleaned on 11/16/22. Additionally, the weekly residential site checklist and its process are implemented as of 1/13/2023. What system has been implemented to make sure the same violation does not occur again? Site Supervisors are required to complete thorough site inspections weekly. Site Supervisors submit checklists to their Program Director, who ensure receipt and review of each. On a quarterly basis, Program Directors complete Quarterly Residential Site Verification Visits. This requires an in-depth inspection of the residence while comparing the findings to the Weekly Residential Site Checklists. All areas of non-compliance require the Site Supervisor, or designee, to adhere to the process identified to ensure resolution which includes but is not limited to: submission of maintenance requests, follow up and through with persons responsible, and ensure resolution. What education and training has been provided to staff? Staff were educated on this regulation during a staff meeting held on 11/17/2022; all exterior surfaces and grounds must be well maintained, free of hazardous material, and in good repair. All staff are aware that any regulatory violation requires the above-mentioned process to be immediately followed through resolution. Site Supervisors are aware that site inspections and the resolution of all violations is their responsibility. All Site Supervisors have been trained and have completed a site inspection utilizing the revised checklist and process. Attachment #1 11/16/2022 Implemented
6400.82(f)There was no hand towel in the main bedroom bathroom.Each bathroom and toilet area that is used shall have a sink, wall mirror, soap, toilet paper, individual clean paper or cloth towels and trash receptacle. What was done immediately to correct the specific issue cited? A hand towel was placed in the bathroom on 11/17/2022. What specific change will be made? All staff and management are required to attend Quarterly Regulatory Workshops facilitated by the Quality Improvement Department. A variety of topics are discussed each quarter, all specific to the regulations followed. Household common areas and spaces specific to the individual(s) are expected to meet the regulatory and agency standards. The Site Supervisor is responsible for conducting a weekly site inspection and completing the Weekly Residential Site Checklist. All staff are responsible for recognizing violations, areas in need of improvement, and following the reporting process. The checklist captures all regulatory and agency expectations. All discovered areas of concern or violation initiate follow-up by the Site Supervisor, or designee, which includes the purchasing and installation of items and/or submission of a maintenance request. If the matter requires maintenance, the Real Estate Department (RED) is responsible for providing updates and follow through. If the matter can be resolved by the Program, the Site Supervisor is responsible for the resolution. If unresolved within one (1) week from the date of discovery, the Program Director is responsible to address the Site Supervisor regarding the status, delay in resolution, and plan of action. If unresolved within two (2) weeks from the date of discovery, the Regional Director is contacted to either: escalate the matter to RED or escalate the matter to the Program Director to address and resolve immediately. Program Director and Site Supervisor will ensure that any unresolved area(s) of concern, do not pose a health and/or safety risk to the Participants or staff. Who (by title) will make the change? Program Director and Site Supervisor will be responsible for making the change When will the change be made? Changes went into effect on 11/17/22 when the appropriate supplies were placed in the bathroom. What system has been implemented to make sure the same violation does not occur again? Site Supervisors are required to complete thorough site inspections weekly. Site Supervisors submit checklists to their Program Director, who ensure receipt and review of each. On a quarterly basis, Program Directors complete Quarterly Residential Site Verification Visits. This requires an in-depth inspection of the residence while comparing the findings to the Weekly Residential Site Checklists. All areas of non-compliance require the Site Supervisor, or designee, to adhere to the process identified to ensure resolution which includes but is not limited to: submission of maintenance requests, follow up and through with persons responsible, and ensure resolution. What education and training has been provided to staff? Staff were educated on this regulation during a staff meeting held on 11/17/2022 each bathroom and toilet area that is used shall have a sink, wall mirror, soap, toilet paper, individual clean paper or cloth towels and trash receptacle. All staff are aware that any regulatory violation requires the above-mentioned process to be immediately followed through resolution. Site Supervisors are aware that site inspections and the resolution of all violations is their responsibility. All Site Supervisors have been trained and have completed a site inspection utilizing the revised checklist and process. Attachment #1.1 11/17/2022 Implemented
SIN-00196926 Renewal 11/16/2021 Compliant - Finalized
RegulationLIS Non-Compliance AreaCorrection RequiredPlans of CorrectionCorrection DatePOC Status
6400.71Emergency telephone numbers were not on or by cordless telephone in the living room.Telephone numbers of the nearest hospital, police department, fire department, ambulance and poison control center shall be on or by each telephone in the home with an outside line. 1. What was done immediately to correct the specific issue cited? Emergency telephone listing was immediately posted by the telephone in the living room of the service location. 2. What specific change will be made? Site Supervisor posts an emergency contact list by every phone in the service location. Emergency contact lists are covered in protective plastic to ensure no damage occurs to the document and it remains in place at all times at the required location. A Daily Shift Checklist has been developed that will include checking to ensure that the phone listing is posted by each phone. 3. Who (by title) will make the change? Site Supervisor and Program Directors. 4. When will the change be made? November 18, 2021 5. What system has been implemented to make sure the same violation does not occur again? All residential staff are responsible for completing daily checks on the Daily Shift Checklist form. Staff will notify the Site Supervisor of any areas that need to be addressed based on the Checklist. Site Supervisor are responsible for reviewing the Daily Site Checklist to ensure that all areas needing attention have been addressed, including the phone listing being posted next to each phone in the home. 6. What education and training has been provided to staff? Staff Meeting was conducted with all during which time all were informed of the need to always have the phone listing next to each phone. All staff were instructed to notify management immediately if phone list is altered or destroyed and not present in the required location. Attachment #5 11/18/2021 Implemented
SIN-00150105 Renewal 12/11/2018 Compliant - Finalized
RegulationLIS Non-Compliance AreaCorrection RequiredPlans of CorrectionCorrection DatePOC Status
6400.72(b)Individual #1's bathroom window had no screen. Screens, windows and doors shall be in good repair. 1. What was done immediately to correct the specific issue cited? Work order completed and Horizon House Real Estate Department bought a new screen and installed it to the window. 2. What specific change will be made? Supervisors and Real Estate staff will ensure during monthly inspections that all doors and windows are secured and screened. 3. Who (by title) will make the change? Supervisors, Program Directors and Real Estate Staff. 4. When will the change be made? Immediately and ongoing, thereafter. 5. What system has been implemented to make sure the same violation does not occur again? Supervisors are responsible for ensuring doors and windows are properly screened. Compliance with this regulation will be monitored through completion of Monthly Residential Checks (managers) and random spot checks completed by Program Directors. Compliance will also be monitored during site visits conducted by HH real estate department. 6. What education and training has been provided to staff? Supervisors receive training on the completion of the Monthly Residential site checklist at the time of their orientation. Supervisors receive follow up education and training at the time of their monthly supervisions when the Monthly Residential Site Checklist is reviewed by the Program Director. Direct service employees receive training regarding physical site compliance and their responsibility to ensure all physical site areas meet regulatory standards at the time of their initial on-site orientation. 7. How will we monitor to prevent reoccurrence? Include specific record keeping, ongoing monitoring activities and action plan follow-up. Supervisors are required to inspect service locations for compliance on a monthly basis. The information recorded on the Monthly Residential Site Checklist is verified quarterly when the Program Director (Manager) completes quantitative record reviews and Residential Spot Checks. During monthly supervision when the Monthly Residential Site Checklist is submit, supervisors are reminded to ensure the accuracy of their report and advised as to how to implement any needed corrective actions. 04/05/2019 Implemented
SIN-00084318 Renewal 02/03/2015 Compliant - Finalized