Inspection IDReason for InspectionInspection DateInspection Status 
SIN-00224042 Unannounced Monitoring 02/23/2023 Compliant - Finalized
RegulationLIS Non-Compliance AreaCorrection RequiredPlans of CorrectionCorrection DatePOC Status
6400.62(a)There were 3 loose Finish Powerball dishwasher pods were under the left side of the sink. They stated call poison control if ingested. The individuals are not poison safe as stated in the ISP.Poisonous materials shall be kept locked or made inaccessible to individuals. The team immediately threw away the pods and ensured that there were no other items that were chemicals that were out. Team was re-educated on #1 Individual Service Plan. o A compliance corner will be sent out to the entire company reminding them of regulation 6400.62(a). o An email communication will be sent out to all the houses for LSS reminding them of the regulation as well. 04/21/2023 Implemented
SIN-00123128 Renewal 01/03/2018 Compliant - Finalized
RegulationLIS Non-Compliance AreaCorrection RequiredPlans of CorrectionCorrection DatePOC Status
6400.82(e)There was no nonslip bath mat in Individual # 1's bath tub. Bathtubs and showers shall have a nonslip surface or mat. Residential Support team will ensure that all homes have a nonslip tub or mat however the tub in question is nonslip. 02/09/2018 Implemented
SIN-00047789 Renewal 03/18/2013 Compliant - Finalized
RegulationLIS Non-Compliance AreaCorrection RequiredPlans of CorrectionCorrection DatePOC Status
6400.181(c)The assessment for Individual #2 does not include how the assessed skills were formulated.(c) The assessment shall be based on assessment instruments, interviews, progress notes and observations. LSS assessment signature/cover page was revised to include how the assessed skills were formulated (see attachment 4). LSS Case Program Coordinators are responsbile in completing the assessment signature/cover page for all annual assessments. Program Case Coordinators are responsible to identify how skills were formulated on each assessment. [Partially Implemented] 04/02/2013 Implemented
6400.181(e)(13)(vii)The assessment for Individual #2 does not include progress and growth in the area of financial independence.(13) The individual's progress over the last 365 calendar days and current level in the following areas: (vii) Financial independence. LSS revised the Assessment Summary to include check boxes identifying either progress or no progress for each specific domain. LSS Program Case Coordinators are responsible to identify whether the individual has either progressed or not progressed in the area of financial independence (see attachment 9). [Partially Implemented] 04/02/2013 Implemented
6400.181(e)(13)(viii)The assessment for Individual #2 does not include progress and growth in the area of managing personal property.(13) The individual's progress over the last 365 calendar days and current level in the following areas: (viii) Managing personal property. LSS revised the Assessment Summary to include check boxes identifying either progress or no progress for each specific domain (see attachment 8). LSS Program Case Coordinators are responsible to identify whether the individual has either progressed or not progressed in the area of managing personal property. [Partially Implemented] 04/02/2013 Implemented
6400.181(f)There is no documentation that plan team members were informed of the results of the assessment for Individual #2, 30 calendar days prior to the ISP meeting.(f) The program specialist shall provide the assessment to the SC, as applicable, and plan team members at least 30 calendar days prior to an ISP meeting for the development, annual update and revision of the ISP under § § 2380.182, 2390.152, 6400.182 and 6500.152 (relating to development, annual update and revision of the ISP). LSS developed an Assessment Summary Notification Letter for team members which indicates date that the assessment was sent to Plan Team Members (see attachment 7). LSS Program Case Coordinators are responsible for sending team member the Assessment Summary Notification Letter 30 days prior to the ISP meeting date. A copy of the letter will be filed in the consumer's program book. [Partially Implemented] 04/02/2013 Implemented
SIN-00237672 Renewal 03/19/2024 Compliant - Finalized
SIN-00167946 Renewal 02/19/2020 Compliant - Finalized
SIN-00076375 Renewal 04/13/2015 Compliant - Finalized
SIN-00063475 Renewal 04/03/2014 Compliant - Finalized
SIN-00046490 Initial review 12/06/2012 Compliant - Finalized