Inspection IDReason for InspectionInspection DateInspection Status 
SIN-00190388 Renewal 08/03/2021 Compliant - Finalized
RegulationLIS Non-Compliance AreaCorrection RequiredPlans of CorrectionCorrection DatePOC Status
6400.165(b)At individual #1's home there is a filled prescription for his prescribed Vaseline 100% pure petroleum jelly; apply to red area around the mouth as needed. This medicine was originally prescribed on 7/2/2019. This script is now over 2 years old. According to individual #1's Individual Plan last updated 07/28/2021, it states he still takes this medication. No stop orders are in his record. According to interviewed staff and medication administration records (MARS), individual #1 has not used this medication since he transferred to UCP.A prescription order shall be kept current.The expired Vaseline 100% pure petroleum jelly was removed from the house on 8/4/2021 and a discontinuation order was received on 8/10/2021 from prescribing Doctor. 08/31/2021 Implemented
SIN-00175241 Unannounced Monitoring 08/18/2020 Compliant - Finalized
RegulationLIS Non-Compliance AreaCorrection RequiredPlans of CorrectionCorrection DatePOC Status
6400.103The written emergency evacuation procedures did not include an emergency shelter location at the time of inspection.There shall be written emergency evacuation procedures that include individual and staff responsibilities, means of transportation and an emergency shelter location. This was corrected during the inspection on 8/19/2020. The Residential Director retrained the managers and supervisors on this regulation to ensure the emergency evacuation procedures include the list of the emergency shelter location on 8/31/2020. The Supervisors will check and ensure that the emergency shelter location list is attached to the evacuation procedures as they review the monthly fire drill and documented on the monthly monitoring form, the Supervisor will complete the initial review for each home by 9/30/2020 to ensure the emergency shelter location list is attached. Managers will randomly review the emergency evacuation procedures every quarter to ensure compliance. The quarterly internal audit teams will review the emergency evacuation procedures to ensure the list of emergency shelter is attached during the audits. 09/30/2020 Implemented